U.S. Department of Defense, NextEnergy (Prime Contractor)

May 2006

“Preliminary Installation Site Survey (site reconnaissance) of the Mobile Micro-Grid Installation Site
NOVI developed the baseline scope for the site preparation of the mobile micro grid system.

Services Used

Micro-Grid Generation, Off-Grid Generation, Small-Scale / Distributed / Embedded Generation, Technology