NOVI evaluated the technical and financial feasibility of 100 MW and a 50 MW wood fired power generating facilities in Halifax County, Virginia utilizing residual biomass from the region’s forest products industries. The study was used in developing the 50 MW South Boston Energy project.
Feasibility of a Wood Fired Power Facility
Jul 2007
Services Used
Biogas, Feasibility Study, Fuel Study, Greenfield Generation, Technology, Waste-to-Energy